User manual

Static Transfer Switch
UNB
User Manual
Page 13 (28)
ELTEK VALERE DEUTSCHLAND ©2009 UM_UNB_E_R04
1
3
2
4
5
6
7
8
9
10
11
12
1
3
2
4
5
6
7
8
9
10
11
12
3.3.4 Connectors UNB 23.0kVA
View from the rear: UNB 23.0kVA
Connector X1 Connector X2
(HAN-K4/8, socket outlet)
Pins (X1)
Function
Pins (X2)
Function
1 Source 1 (inverter)/Phase L1 1 Source 1 (inverter)/Phase L1
2 Source 2 (substitute mains)/Phase L1 2 Source 2 (substitute mains)/Phase L1
3 Source 1 & 2/ neutral 3 No connection
4 UNB Output/Phase L1 4 UNB Output/Phase L1
5 DC-supply / L+ (24 / 48 / 108 / 216V
DC)
5 No connection
6 DC-supply / L- (24 / 48 / 108 / 216V DC) 6 No connection
7 Synchronization / SYNC-SIG 7 No connection
8 Synchronization / SYNC-STAT 8 No connection
9 Indication relay general fault / NC 9 Remote switch ON (+24V)
10 Indication relay general fault / NO 10 No connection
11 Indication relay general fault / COM* 11 No connection
12 Synchronization / SYNC-GND 12 No connection
*Function logic: fault = COM and NC closed
OK = COM and NO closed
(Is equal to the programming “not inverted”)
REMARK: If the UNB works in combination with a single inverter or inverters in parallel operation it is necessary to
connect through the synchronization bus (contacts SYNC-GND SYNC-GND, SYNC-SIG SYNC-SIG and SYNC-
STAT SYNC-STAT) between the inverter(s) and the UNB.
X1
X2