Installation manual

Glycol Cooled/GLYCOOL™ Models
41
Figure 27 Upflow GLYCOOL
cooled (VE) piping connections
Table 31 Upflow GLYCOOL (VE) piping connection sizes, inches
GLYCOOL Models
60 Hz (50 Hz)
A
(OD Cu)
B
(OD Cu)
VE072G (VE072G)
1-5/8 1-5/8VE110G (VE111G)
VE116G (VE121G)
VE192G (VE192G)
2-1/8 2-1/8VE240G (VE240G)
VE363G (VE363G)
A
- Glycol Supply Line.
B - Glycol Return Line.
1/4" OD CU Humidifier
Water Supply Line.
3/4" NPT Condensate Drain.
Field pitch a min. of 1/8"
(3.2mm) per ft. (305mm). Do
not install an external trap.
NOTE: Install all piping
per local codes.
UNIT LEFT
END PANEL
3 3/8"
(85mm)
16"
(406mm)
2 3/8"
(60.3mm)
7/8"
(22.2mm)
1" (25.4mm) REAR PANEL
UNIT CONNECTION LOCATIONS
Piping stubbed out inside unit end compartment for field
connection through 2 3/8" x 16" (60.3 x 406mm)
opening as shown. Piping is recessed inside the unit and
not flush as indicated. Piping may also exit through bottom
of end compartment by field cutting an opening in a
suitable location (except bottom return air units).
DPN000588_Rev0
DISCONTINUED
PRODUC T