Owner`s manual
28365-2-0811Page 56
1. Using gloves, unpack liner components and check for
damaged or missing components.
2. Lower bottom louver and remove upper louver on
replace.
3. Remove glass frame assembly from replace.
4. Remove rear logs from burner assembly.
5. Place brick panel (rear) against rear wall in replace.
Note: The top edge will have a half-moon cutout relief to
match up with the rear ue vent hole.
6. While holding the front nished edge of a side brick
panel (left & right), place brick panel (sides) against side
walls in replace. NOTE: The side brick panels should
be installed with full brick pattern at the bottom. Move
side panels rearward until the back edge meets the rear
brick panel. Slide side brick panels down so they rest on
rebox bottom, and brick joints match up with the back
brick panel.
7. Align grout lines on top brick panel with the grout lines
on the side brick panels. Place the top brick panel into
brick panel holder. With needle-nose pliers, carefully
bend hold-down tabs on brick panel holder over the
edges of the top brick panel. The hold-down tabs will
securely hold the top brick panel in place.
8. Replace rear logs onto burner assembly. (Refer to log
placement, pages 36 and 37.
9. Attach glass frame assembly onto replace.
10. Raise bottom louver and replace top louver onto
replace.
11. Installation of optional brick liner is complete.