Owner`s manual

26557-0-0110Page 12
4. Insertblowerassemblyintointerior,bottomofrebox.Po-
sition blower assembly so that you align the notch on back
of blower assembly with the center screw on side/end panel,
thenpushtheblower assembly againstreboxouterpanel.
The blower wheel must be centered with the side/end wall of
therebox.Themagnetsonthebackandbottomofblower
assemblywillsufcientlyholdblowerassemblyinplace.See
Figure 16.
5. Once the blower assembly is in position, locate the plug but-
toninthetopcorneroftherebox.Removetheplugwitha
standard screwdriver and discard plug.
6. Next, nd the fan control switch and wire assembly. Feed
thewiresthroughtheholeatthetopoftherebox.Feedthe
wiresoverthereboxtopanddownbetweenthereboxside
and outer wrap then, secure the fan control switch with (2) #6
screws provided. See Figure 15.
7. Thefan control wires will slide down between the rebox
and outer wrap near the blower assembly. See Figure 16.
8. One fan control wire will have a 1/4” female terminal that
must be attached to the open terminal on the blower motor.
See Figure 19, Connection A.
9. The other fan control wire has a 1/4” male terminal. Attach
this terminal to the open terminal on the blower power cord.
See Figure 19, Connection B
10. Route the wires away from moving parts of the blower as-
sembly and retain wires together near the blower motor using
the plastic purse clip provided.
11. To complete the installation, plug the power cord into the
junction box receptacle previously installed in the bottom of
therebox.See Figures 16 and 18.
12. Once all connections are made electrically, it is recommend-
ed that you test the blower fan control operation by turning
on power to the blower (Caution: 110 Volt). Then apply heat
tothefancontrolswitchinsidethereboxwithalighteror
match until blower is activated. Once blower is activated,
check for proper operation. Do not place hands near blower
assembly or other wiring while power is on.
13. Replacebloweraccessplateandlouversorushpanels.See
Figures 13 and 14.
14. This completes the installation of the optional FBB5 Blower
kit accessory.
Note: This blower is equipped with a heat activated fan control
switch. Blower will operate when the rebox warms up,
and will turn off automatically when the rebox cools
down. The time will vary for the activation of the fan con-
trolswitchdependingonseveralfactorsincludingrebox/
log set sizing, BTU input variables, and log set position-
ing. Generally, it may take from 5 to 20 minutes to activate
blower/fan control from a cold start.
Figure 15
Figure 17
FA N CONTROL
SWITCH LOCATION
USE SCVI VARIABLE SPEED
CONTROL OPTION, OR STANDARD
ON/OFF WALL SWITCH TO
OPERATE OPTIONAL BLOWER
Figure 16
JUNCTION
BOX
HEARTH
POWER CORD
BLOWER ASSEMBLY
(CENTER AND INSTALL
AGAINST OUTER WRAP
AS SHOWN)
WIRES
FROM FAN
CONTROL
SWITCH
OUTER
WRAP