Owner`s manual
26557-0-0110Page 6
Any vent-free Gas Log Heater must be “For use with approved
ANSI Z21.11.2 unvented room heater.”
Follow and complete the installation instructions of the gas log set
andtherequirementsofthisrebox.
Checkallttingsforleaksbeforelightingthegaslogset.
In planning the installation for the rebox, it is necessary to
determine where the unit is to be installed and whether optional
accessories are desired. Gas supply piping should also be planned
at this time.
A gas shut off must be in this line.
Thereboxcanbemountedonanyofthesesurfaces:
1. Aathardcombustibleornon-combustiblesurface.
2. A raised platform of combustible or non-combustible
material.
3. Recessedintotheoorasillustratedby Figure 4.
4. Supportedunderall(4)cornersofthereboxsothatcontact
is made on all four perimeter edges on the bottom of the unit
(Example: Four (4) concrete masonry blocks).
If the firebox is installed directly on carpeting, tile or other
combustiblematerialotherthanwoodooring,itshouldbeinstalled
on a metal or wood panel extending the full width and depth of
the unit.
At this point, you should have decided what components to include
inyourinstallation,andwherethereboxistobelocated.Ifthis
has not been done, stop and consult your dealer for assistance with
this planning.
Planning Your Installation
Accessory kits such as the FBB5 Blower kit, Trim kits, Mantles,
plus other Decorative Frame, Hood, and Door accessory kits may
beinstalledafterthereboxissecuredtotheframing.
Refer to the instructions provided with each of the optional
accessory kits for proper installation and operation.
Firebox Framing
Firebox framing can be built before or after the rebox is set
in place. Framing should be constructed to accommodate wall
Figure 4
Figure 5
FIREBOX INSTALLATION INSTRUCTIONS
FLUSH FACE LOUVERED
COMBUSTIBLE MATERIALS ALLOWED
Premium Vent-Free Firebox Framing Dimensions (in
inches)
"A" "B" "C"*
Model Framing
Height
Framing
Width
Framing
Depth
VFP36SB 411/2" 40" 23"*
VFP36PB 411/2" 39"** 23"*
Attention: Addheightofbaseto"A"Dimensionwhenelevat-
ingreboxifinstallingonanelevatedbase.
Framing dimension A incudes a three inch clearance for
standoffs on rebox.
*Dimension"C"assumesuseof1/2"wallboardushtoboth
front faces.
**Peninsulamodelframingwidthassumesuseof1/2"wall
boardushtotheendface.
A
B
C
A
B
C
Framing - Peninsula
Framing - See-Through
coveringandreboxfacingmaterial.Thereboxframingshould
be constructed of 2 x 4 lumber or heavier. The framing headers
mayrestonthetopofthereboxstandoffs.RefertoFigure 5 for
reboxframingdimensions.
Note: On Peninsula models, a maximum weight of 250 lbs. is
recommended when construction materials are supported by the
top standoff spacers.