Installation Sheet

Towel Bar Installation Guide
IN4-TOWELBAR REV. 17A 05/3/17
2. Mark hole locations
Locate Center of Mounting Plates
Install Screw Anchors
Install Mounting Plates
Install Trim Plates and Towel Bar
Tighten Set Screw
Install Mounting Plates
1
3
4
5
6
2
Make two marks on wall to locate center of mouting
plates. Center to center spacing for mounting plates is
the same as the length of the towerl bar.
Mark three hole locations
for each mouting plate.
Use a screw driver to install three screw anchors
into the wall for each mounting plate.
Secure mounting plates
using screws provided.
Tighten set screw at base of post
with Allen Wrench Provided.
Slip Trim Plates and Tower Bar posts
over the mounting plate studs.
Trim Plates vary depending on style
12”, 18”, 24” or 30”
12”, 18”, 24” or 30”

Summary of content (1 pages)