Installation Manual

Installing the Enphase S-Series Microinverters
and Engage Cable
QUICK INSTALL GUIDE
®
The Enphase S-Series Microinverter (S280-60-LL and S230-60-LL) meets the requirements of NEC 690.35.
Enphase Microinverters do not require that you install a GEC between microinverters because the DC circuit is isolated and
insulated from ground.
Ground fault protection (GFP) is integrated into the microinverter. To support integrated GFP, use only PV modules equipped
with DC cables labeled PV Wire or PV Cable.
To monitor solar production you must install an Envoy-S. Refer to the Envoy-S Installation and Operation Manual or Quick Install
Guide
Parts and Tools Required
In addition to the S-Series Microinverters, PV modules, and racking, you will need the following.
Enphase Items
Enphase Envoy-S
Enphase Installer Toolkit mobil app (optional, but
strongly recommended)
Engage Cable, single-phase 240 VAC or three-phase
208 VAC
Cable clips
Sealing caps, as needed (for any unused drops on the
Engage Cable)
Terminators, as needed (one needed at the end of each
AC branch circuit)
Enphase disconnect tool
Other Items
Outdoor-rated, weather-proof AC junction box(es)
Gland or strain relief tting (one per AC junction box)
Number 2 Phillips screwdriver
Number 3 Phillips screwdriver
Torque wrench, sockets, wrenches for mounting
hardware
Adjustable wrench or open-ended wrench (for
terminators)
iOS (v7.0 or later) or Android (v4.2 or later) mobile
device installed with Enphase Installer Toolkit
Check the drop connector labels to
be sure that you have the right cable.
You must use 240 VAC cable for single-phase
or 208 VAC cable for three-phase.
AC connector
Enphase
S280 or
S230
Microinverter
DC
connectors
AC
junction box
terminator
Engage
Cable
tie wraps or
cable clips
AC drop on
Engage Cable