Prior to making a connection, read and follow the full instruction sheets IPP, IPX,
IPRNS (included only with molds used on rail property not to rail) and the special
instructions below.
Insert cu braid into flared sleeve letting end of braid protrude .13" [3 mm] beyond
1.
end of sleeve.
Position mold around steel wire (As shown above).
2.
Insert sleeve with braid fully into mold until flare in sleeve is against side of mold.
3.
Clamp mold securely using "E-Z" Change Clamp.
4.
TECHNICAL SUPPORT:
www.erico.com
IP6910_B
INSTRUCTION SHEET
1 OF 1
© 1995, 2014
ERICO International Corporation
Cable To Ground Wire
WARNING:
ERICO products shall be installed and used only as indicated in ERICO product instruction sheets and training materials. Instruction sheets are available at
1.
www.erico.com
and from your ERICO customer service representative.
ERICO products must never be used for a purpose other than the purpose for which they were designed or in a manner that exceeds specified load ratings.
2.
All instructions must be
completely
followed to ensure proper and safe installation and performance.
3.
Improper installation, misuse, misapplication or other failure to completely follow ERICO's instructions and warnings may cause product malfunction, property
4.
damage, serious bodily injury and death.
SAFETY INSTRUCTIONS:
All governing codes and regulations and those required by the job site must be observed.
Always use appropriate safety equipment such as eye protection, hard hat, and gloves as appropriate to the application.