Installation Guide

10
SHOWER DOOR
Hotline : + 1 302 336 8180
Fasten the Door panel(B)
Inside View
Φ=1/8"
Drill Bit
1
2
Inside View
3
After final adjustments, drill Ø1/8” holes in the Wall Jamb (C).
Drill only through the first layer of the Door panel Profile and
install the ST4.0x10mm Pan Head Screws (dd) using the
Decorative Covers and Washers (cc)
3
Include the washers when
installing the ST4.0×10mm
Pan Head Screws (dd)
and Decorative Caps (cc) .
NOTE
NOTE
washer
decorative
cap
ST4X10mm
Pan Head Screw
X3
cc
X3
dd
Adjustment
3
8
" max
±0.0±0.0
Threshold must be level