Installation Guide

8
SHOWER DOOR
Hotline : + 1 302 336 8180Hotline : + 1 302 336 8180
1.Drill the holes as Fig.a and Fig.b;
2.Apply silicone into the groove along the entire
length of the Wall Jamb(C) as Fig c;
3.Attach the Wall Jamb(C) to the wall as Fig d.
NOTE
Fig.a
Fig.b
Fig.c
see NOTE
see NOTE
X3
aa
Fig.d
X3
bb
· If a Stud is presented behind the wall:
drill a Ø1/8”(3mm) pilot hole into the stud and
use the ST4.0 x 30mm Pan Head Screws (bb)
OR
· If No Stud is presented behind the wall:
drill a Ø1/4”(6mm) hole and insert the Wall Anchors (aa)
and use the ST4.0 x 30mm Pan Head Screws (bb).
NOTE
1-2
Wall Jamb
(C) Installation