installation and_manual

INSTALLATION INSTRUCTIONS
A f f i n i t y 3 0 G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
10
CLEARANCE DIMENSIONS
Read the instructions carefully in this booklet to install the
Evo A nity 30G Cooktop to a metal, stone or wood counter top surface.
Cabinet layout and construction may vary.
CLEARANCE TO COMBUSTIBLE CONSTRUCTION FROM CHASSIS
Combustibles Non-combustibles
Back * 3/8” 0”
Sides * 3/8” 0”
Bottom 3” 3”
CLEARANCE TO COMBUSTIBLE CONSTRUCTION FROM COOKING SURFACE
Top 36”
Sides 12”
Back 12”
36” CLEARANCE FROM COOKING
SURFACE TO COMBUSTIBLE
CEILING MATERIALS.
12” CLEARANCE
FROM COOKING
SURFACE TO
COMBUSTIBLE
SIDEWALL
MATERIALS.
12” CLEARANCE
FROM COOKING
SURFACE TO
COMBUSTIBLE
BACK WALL
MATERIALS.
The minimum environmental temperature for safe use of the Evo Affi nity 30G
should not be below 32°F ( 0° C).
IF INSTALLING
ALONGSIDE
ANOTHER 30G
UNIT, PROVIDE
2” MINIMUM
CLEARANCE
FROM EDGE
OF DRIP PANS.
Minimum 3” clearance required under unit venting to 22 sq/in of combustible air.
* 3/8” of cement board lined enclosure to chassis.