Installation Guide

WIQPC1010REV‐  Page|5of7   STACKEDSTONE
andallowthepanelstoseatthemselves.Thestoppostsaredesignedtopreventbucklingdueto
changingtemperatures.
Reminder:Besurealllockingfingersareproperlyengaged.
Figure7
STEP SEVENAswithanyplasticexteriorbuildingmaterial,theStackedStonepanelwillexpandand
contractwithachangeintemperature.Therefore,duringinstallationitisnecessarytoposition the
panelsproperlytocompe nsatefortemperatureeffects.Wheninstallingatpaneltemperaturesfrom30
to100degreesFahrenheit,positionthenextpanelsothattheupperleftcornerofthepanel’snailing
hemisbuttedagainst
thepreceding(i nstalled)panel(Figure#8).
Forinstallationsattemperaturesbelow30degreesF,positionthenextpanelslightlyrightofthe
precedingpanel’sedge(e.g.1/16”).Fortemperaturesabove100degreesF,positionslightlyleftsothe
paneloverlapstheprecedingpanel.Oncethepanelhasbeenproperlyspaced,
insertafastenerintothe
centerholeofthepanel.
Figure8
STEP EIGHTFittingpanelpiecesbetweenwindowsoraround openings requiresacutbackspacing
of1/8''whenpanelsareinstalledincoldtemperatures.Similarspacingmayalsobenecessarywhen
fittingpanelsintogableends,overroofangles,aroundlightblocksoranyotherplacewhereadequate
panelmovementisprevented.