- Extron Electronics Interfacing Switching and Distribution User's Manual

CVEQ 100 and SVEQ 100 Series • Installation
Installation
CVEQ 100 and SVEQ 100 Series • Installation
2-8
2-9
Preparing the CVEQ 100 for through-desk mounting
1. If rubber feet were previously attached to the bottom of
the unit, remove them.
2. Attach the mounting brackets to the CVEQ 100 with the
provided machine screws as shown in the previous gure.
3. Hold the unit with the attached brackets against the
underside of the table or other furniture. On the
mounting surface, mark the location of the bracket’s screw
holes.
4. Mark the opening on the desk using a soft pencil. The
opening should be slightly larger than the dimensions of
the unit.
Use an appropriate saw to cut the opening. If needed,
enlarge the hole with a le or sandpaper.
5. Drill ³⁄
³²
" (2 mm) diameter pilot holes, ¼" (6.3 mm) deep in
the mounting surface at the marked screw locations.
6. Insert #8 wood screws into the four pilot holes. Tighten
each screw into the mounting surface until slightly less
than ¼" of the screw head protrudes.
7. Align the mounting screws with the slots in the brackets
and place the unit against the surface, with the screws
through the bracket slots.
8. Slide the unit slightly forward or back, then tighten all
four screws to secure it in place.
9. Attach input and output cables. See chapter 3.
Back of the rack mounting (SVEQ 100 only)
The SVEQ 100 can be mounted to the rear of a rack using the
Extron VersaTools MBB 100 back of the rack mounting kit
(part #70-367-01). The kit allows the product to be vertically
mounted to the front or rear rack supports and facing either
towards the front or the rear of the rack.
BackofRackMountingEars
Using the MBB 100 back of the rack kit
1. If necessary, remove the feet from the bottom of the
line driver.
2. Remove two screws from one side of the unit. Retain the
screws for possible later reassembly without the bracket.
3. Attach one bracket to the side of the unit using the longer
screws included in the kit.
4. Repeat steps 2 and 3 on the other side of the unit.
5. Mount the unit to the rack using the two included rack
screws (see the following illustration). The SVEQ 100 can
be vertically mounted facing in either direction. See the
following diagram.
7. Attach input and output cables. See chapter 3 for details
on wiring.
N
Only VersaTools products and most IP Link products can
be mounted using the back of the rack mounting kit.