Instructions / Assembly

-7-
4.6.
The vertical posts of the handrails each have two holes that correspond with the threaded studs on the
end brackets. Slide the handrail vertical posts over the threaded studs.
4.6.1.
If end bracket studs do not align with holes in handrail vertical posts, there are a couple of areas
to confirm:
Ensure that the end bracket is installed into the proper threaded insert (see FIG. 5
for proper installation location).
Ensure that the orientation of the handrail section correct. If necessary, flip the
handrail section 180-degrees so that ‘END 1’ is flipped to the ‘END 2’ position (FIG. 6).
4.7.
Attach using one 5/16″ flat washer and one 5/16-18 nut per stud (FIG. 6).
FIG. 6
IMAGE SHOWN WITH
VERTICAL PICKETS
END 1
END 2