Use & Care Guide and Installation Instructions

10
2.1
2.2
7
9
10
8
Slightly widen
the two sides
of the upper
chimney and
hook them
behind the
brackets 7.2.1,
making sure
that they are
well seated.
Secure the sides to the brackets by using the 4
screws 12b.
Only for the recirculation
version, put connection in
to the hood body air outlet.
Ensure that the activated
charcoal lters have been
inserted.
12
Fix the bracket
7.2.1 using the
screws 12a
supplied.
11
Slightly widen
the two sides of
the lower section
and hook them
between
the upper section
and the wall,
making sure that
they are properly
housed.
Install Roof or Wall
Cap purchased
separately. Con-
nect the 6" metal
ductwork to the
Roof or Wall Cap
and then attach
ductwork.
Vertical or Horizontal
Ducting Installation
Non-Ducted Recirculation Option
L = 4x
12a

N = 4x
12b
2.1
