Full Product Manual

4
Ceiling
Chain and V-Hook Installation
Turn the power OFF at the switch,
fusebox, or the circuit breaker.
Attach two hanging hooks (GG) to the ceiling. The spacing
between the hanging hooks should be 46 in. If the ceiling
is concrete or drywall, drill two holes and insert two
anchors (EE).
4
Attaching the hanging chain
5
Attaching the zip tie
6
Turning on the power
Attach the chain (AA) to the V-hooks (BB)
then insert the hooks into the mounting holes
located on the top of the xture. Do this for
both ends of the xture.
3
Installing the chain to V-hooks
1
Turning off the power
2
Attaching hanging hooks
Hang the hanging chain (AA) onto the hanging hooks (GG)
and plug in the power cord to the outlet.
Use the zip tie (CC) to attach the cord to the hanging
chain (AA).
Turn the power ON at the switch, fusebox, or the circuit breaker.
Turn the xture ON/OFF using the provided remote.
AA
AA
BB
GG
46 in.
CC
AA
Ceiling
Ceiling
7
Linking multiple shoplights (optional)
Link up to six.
GG
EE