Full Product Manual

5 FEIT.COM
Please contact 1-866-326-BULB (2852) for further assistance.
Fixture Flush Mount Screw Installation
Turn the power OFF at the switch, fusebox, or the circuit breaker.
Turn the power ON at the switch, fusebox, or the circuit breaker.
Turn the xture ON/OFF using the provided remote.
Using the provided mounting template (LL), drill two holes 44 in. apart. Be sure to offset the right hole (or opposite side) by 5/8 in.
If the ceiling is concrete or drywall, drill two holes and insert two anchors (EE).
Lift the xture (FF) up to the mounting screws (DD) tting into place thru large openings. The xture should be rmly xed
against the mounting screws (DD). Push the xture forward or backward to lock in place. Plug in the power cord to the outlet.
4
Turning on the power
2
Attaching the anchors and screws
3
Securing the xture
44 in.
EE
5/8 in.
offset
offset this
screw by
5/8 in.
D 0.079 – 0.099 in.
Ceiling
5
Linking multiple shoplights (optional)
Link up to six.
DD
DD
1
Turning off the power