User Manual

5. Commissioning
55
Festo GDCP−SFCLACIDN−EN en 0812NH
5.1.1 Checking the drive
Note
During operation, the drive must not strike a stop without
shock absorption.
· Use shock absorbers or buffers on all stops
(exception: homing to a fixed stop).
· Before commissioning, make sure that drive and
controller are completely set up and wired and that the
working space is adequate for operation with an eff
ective
load.
· Observe the notes in the operating instructions for the
axis used.
5.1.2 Checking the power supply
Caution
Interruption of running tasks due to inadequate load
voltage supply (LOAD POWER DOWN")
· Make sure that the load voltage supply tolerance can be
maintained at full load directly on the voltage terminal of
the SFCLACI (see section 3.2).
Caution
Loss of reference position due to inadequate logic supply
voltage
· Always carry out a homing run every time the logic
voltage supply is switched on, in order to anchor the
measuring reference system to the
reference point
(REF).
The SFCLACI does not carry out any positioning tasks if it
is not referenced.