Instructions / Assembly

7
fillrite.com | tuthill.com
INSTALLATION AND OPERATION MANUAL
Your Fill‑Rite pump nozzle can be pad locked to the pump for added security. Withthe
pump turned off, and the nozzle in the stored position, a pad lock can be inserted
through the locking link and the nozzle handle opening. This configuration prevents
thenozzle from being removed from the nozzle boot.
The locking link is located on the nozzle side of the pump, and can be pivoted into
position to work with the nozzle listed on the barrel label of your NX25‑120 or
NX25‑240 pump. Use the appropriate position and hole to lock your nozzle securely
toyour NX25‑120 or NX25‑240 series pump.
Operating Instructions
1. Remove dispensing nozzle from nozzle boot.
2. Move the switch lever to the “ON” (raised) position to start the motor. The pump should
start and settle into a slow idle.
3. Insert the dispensing nozzle into the container to be filled.
4. Operate the nozzle to dispense fluid; release nozzle when the desired amount of fluid
has been dispensed.
5. Move switch lever to the “OFF” (lowered) position to stop the motor.
6. Remove the dispensing nozzle from the container being filled and store it
inthenozzleboot.
CAUTION! Always keep the nozzle in contact with the container
being filled during the filling process to minimize the possibility
of static electricity build up.
IMPORTANT! The motor has power at all times when connected to a power
source. The switch does not apply or interrupt power to the motor. High
voltage may still be present inside the pump after power is removed.
Pump Switch Lever
OFF
ON
Pad Locking