Operation Manual

19
Maintenance
Item Time Frame Instructions Notes
Seat and Seat
Rails
Weekly Wipe down Seat Rails with lint free
cloth.
Frame
Weekly Wipe down Frame with lint free cloth.
Tank and Water
Treatment
12 months to 2
years
Follow instructions as specified in the
“Water Treatment Procedure” section
of this manual.
Bungee Cord
Check every
hundred hours for
correct tension
and for signs of
wear.
The Bungee Cord should last for
many years. If a Bungee Cord change
is required, please contact your local
service representative or go online at
www.firstdegreefitness.com
for further details.
Rowing Belt
Check every
hundred hours for
correct tension
and for signs of
wear.
The Rowing Belt should provide
many years of trouble free use.
If a Rowing Belt change is required,
please contact your local service
representative or go online at
www.firstdegreefitness.com for
further details.
All preventive maintenance activities must be performed on a regular basis. Performing
routine preventive maintenance actions can aid in providing safe, trouble-free operation
of all FIRST DEGREE FITNESS equipment.
FIRST DEGREE FITNESS is not responsible for performing regular inspection and
maintenance actions for your machines. Instruct all personnel in equipment inspection
and maintenance actions and also in accident reporting and recording.