Instructions
Table Of Contents
- DSX-600 Users Manual
- LIMITED WARRANTY AND LIMITATION OF LIABILITY
- Contents
- List of Figures
- Chapter 1: Get Acquainted
- Overview of Features
- Contact Fluke Networks
- Register Your Product
- Technical Reference Handbook
- Additional Resources
- Supplements and Updated Manuals
- Kit Contents
- Symbols
- Safety Information
- Connectors, Keys, and LEDs
- About Link Interface Adapters
- AC Adapter and Battery
- Verify Operation
- How to Use the Touchscreen
- Change the Language
- Buttons to Do Tests and Save Results
- Overview of Memory Functions
- Options for Cable IDs
- About LinkWare Applications
- Chapter 2: Certify Twisted Pair Cabling
- Chapter 3: Certify Coaxial Cabling
- Chapter 4: Manage Test Results
- Chapter 5: Use Projects
- Chapter 6: Sync Projects with LinkWare™ Live
- Sign Up for a LinkWare Live Account
- How to See the Tester’s MAC Address
- Use LinkWare Live Through a Wired Ethernet Network
- Use LinkWare Live Through a Wi-Fi Network
- When You Cannot Sync a Deleted Project
- About the Asset Management Service
- Change the Network Settings
- Sign Your Tester Out of LinkWare Live
- Sign In to LinkWare Live from a Desktop or Mobile Device
- Import Projects from LinkWare Live into LinkWare PC
- Learn More About LinkWare Live
- Chapter 7: Maintenance
Chapter 5: Use Projects
The PROJECT Screen
79
BA08.EPS
Figure 29. PROJECT Screen
Results: A summary of the test results in the project:
: The number of tests that failed.
: The number of tests that passed.
: The number of DSX CableAnalyzer results that have PASS*
results. PASS* results have measurements within the range of
accuracy uncertainty for the tester. See “PASS*/FAIL* Results” on
page 42.
Test Setup: The tests that are available in the project.
To add a test to the project, tap NEW TEST.
J
A
B
G
E
F
H
C
D
J
I