Product Manual

6. Deburr the holes and remove any shavings.
7. Degrease the front panel.
Installation
To install:
1. Insert the IR Window assembly into the punched hole.
2. Align and î‚¿rmly hold the IR Window in place.
3. Apply a slight amount of torque to each of the four jam-nut screws to break
them loose from the install position.
4. Incrementally tighten each jam-nut screw in a cross-pattern to the torque
recommended in Table 4. This torque makes sure that the frame gasket is
compressed for an optimum seal. See Figure 6.
Note
If a calibrated torque driver is not available, be careful that you do not over
tighten and break the jam-nut screws.
Table 4. Torque Values for Jam-Nut Screws
Model Torque (max.)
CV200, CV201 14 in lb
CV300, CV301 25 in lb
CV400, CV401 50 in lb
4