Installation Guide

MFF-AMTS-CP
MFF-AMTS-BN
MFF-AMTS-ORB
Installation/Installation/Instalación
Revised 6-2018 Revised 6-2018
Thread the shower head
clockwise onto the shower arm.
11
Unscrew the screw counterclockwise
from the spout and remove the
connector assembly.
1
Remove the mud guard.
Carefully slide the escutcheon onto
the valve.
2 3
Place handle assembly on valve
and rotate clockwise to secure
escutcheon.
Re-install the trimmed stem and
nipple on the valve.
Carefully slide the escutcheon onto
the valve and place handle assembly
on valve and rotate clockwise to
secure escutcheon.
9
If handle assembly will not secure
escutcheon to the wall, measure and
note the distance ‘XX’(the distance
between the bottom of the handle
assembly and the escutcheon)
Unscrew the handle assembly
counterclockwise from valve and
remove the escutcheon.
5 6
Cut stem and nipple the amount
noted in step # 4. (Never cut the
stem and nipple while still on the
valve. This may damage the valve.)
14
Turn on the handle and check the
function of the spout.
13
Install the spout onto the connector,
and thread the screw clockwise to
fix the spout.
15
Pull up on the lift knob of the spout.
Check the diverter function.
Apply teflon tape to the shower arm
and thread clockwise onto the
nipple. Then slide the flange down.
4
a
b
}
7
a
8
Thread Teflon Tape
10 12
Put on the connector assembly
onto the tub spout nipple.
b