Installation Sheet

page 12/33
STEP-BY-STEP ILLUSTRATED
OPERATING MANUAL/INSTALLATION STEPS
Massa Intelligent Toilet
FOREMOST INTERNATIONAL LTD. (CANADA): 5970 Chedworth Way, Unit B, Mississauga, Ontario, Canada L5R 4G5 - 1-888-256-7551 www.foremostcanada.com
FOREMOST GROUPS INC. (U.S.A.): 6241 Northwind Parkway, Hobart, IN, USA 46342 - 1-888-620-3667 www.foremostbath.com
NOVEMBER
2020
ILLUMINATED INGENUITY
INSTALLATION STEPS
LIFT THE PACKAGING UPWARDS TO EXPOSE THE TOILET (FIGURE 1)
According to the following diagrams, put the accessories aside for later use, and then lift the packaging upwards to allow
for the toilet to be exposed.
FIGURE 1
1
DRAW A CROSS MARKER ON THE DRAIN OUTLET ON THE GROUND
Clean the floor and wipe o any excess dust or dirt (FIGURE 2). Failure to install on an cleaned surface will aect the
quality of installation.
FIGURE 2
2
INSTALLATION OF FLOOR FLANGE
Install the new flange to the drain outlet or use existing one and draw a
cross line with an erasable marker as a reference line for installing the toilet
(FIGURE 3).
FIGURE 3
3
Ground Flange
12" (305mm)
8" (200mm)
Grounded waterproof and splash-
proof electrical outlet.
Existing water supply
angle valve
Drain outlet
Cross marker