Installation Guide

Fe
26
TRADITIONAL INSTALLATION
19
UNIVERSAL BRACKET WITH ATP: POST MOUNTING
• ReferencePostMounnginstruconsonpage5.
Note:
Its recommended to install brackets onto post before
post mounng.
UNIVERSAL BRACKET WITH ATP: BRACKET INSTALLATION
1/2”[13mm]4”[102mm] 37”[940mm]
10/16”[16mm]
4-5/16”[110mm]
34” [864mm] Panel
1/2”[13mm]4”[102mm] 35”[889mm]
10/16”[16mm]
4-5/16”[110mm]
Fig. 38
Bracket Hole Locaons: Universal Bracket With ATP
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
A*
B C D
32” [813mm] Panel
All panel sizes except 40” [1016mm] panel can use the ATP.
Only 32” [813mm] and 34” [864mm] panels are used with ATP’s in California.
*DimensionAposionsboomedgeofboomrail3-3/4”[95mm]abovedecksurface.
*DimensionAismeasuredfromtheboomsurfaceofpostbase.
E
1/2”[13mm]4”[102mm] 41”[1041mm]
10/16”[16mm]
4-5/16”[110mm]
38” [965mm] Panel
Step 1: Mark Bracket Hole Locaons
1. Markthecenterlineofeachpostwithapencil.
2. TakemeasurementsusedinFig.38and39tomarkbracket
holelocaonsontoposts.
Tip:
Remove all metal shavings from deck, post base cover,
post, and panel before bracket is screwed to post to
prevent rust stains.