Installation Guide

24
Fe
26
TRADITIONAL INSTALLATION
Step 2: Pre-Drill Bracket Holes
• ReferenceBracketholepre-drillinginstruconson
page10(Step2:1&2).
Note:
DO NOTinstallbracketsinthisstep.
COLLAR BRACKET (CB-04): CUTTING DOWN PANEL
• ReferencePanelcunginstruconsonpages11-13.
Note:
When measuring the panel opening length for the CB-04
installaon, measure from the inside face of each post.
COLLAR BRACKET (CB-04): PANEL INSTALLATION
Step 1: Install I-Support On Boom Rail
• ReferenceI-Supporttoboomrailinstruconsonpage13,
step1.
Step 2: Install Panel
1. SlideCB-04Bracketsovereachendoftheboom&top
rails.Makesurethatallsetscrewholesfacethedesired
direcon.AsshowninFig.44.
2. SecureBracketsintopre-drilledBracketholesonpostwith
providedT-25DriveThread-CungScrews.
3. Pre-drillBracketSetScrewholesonboom&topRail
usinga3/16”[5mm]drillbit.
4. SecureBracketontoRailswithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.As
showninFig.45.