Installation Guide

26
Fe
26
TRADITIONAL INSTALLATION
Fe
26
Tradional Collar Bracket (CB-04) with Accent Top
Panel (ATP) Installaon Opon
COLLAR BRACKET WITH ACCENT TOP PANEL (ATP)
Ball Cap
PressedDomeCap
CB-05
Accent Top Panel (ATP)
3-3/4”[95mm]I-Support
Post Base Cover
CB-04
2”X2”&3”X3”
[51mmx51mm]
&[76mmx76mm]
Iron Posts With Base
Fe
26
TradionalPanel
6’,8’or10’
[1829mm,2438mm
or 3048mm]
*Installed heights include a 3-3/4”[95mm]spacebetweendecksurface
andboomedgeofboomrail.
Collar Bracket (CB-04)WithAccentTopPanel(ATP)PostConguraon
Fe
26
Tradional
Panel Height
Rail Panel With ATP
Installed Panel Height* RequiredPost
32”[813mm] 40-3/4”[1035mm] 39-1/2”[1003mm]
34”[864mm]
42-3/4”[1086mm]
45-1/2”[1156mm]
38”[965mm]
46-3/4”[1187mm]
55-1/2”[1410mm]