Installation Guide

Fe
26
TRADITIONAL INSTALLATION
27
COLLAR BRACKET WITH ATP: POST MOUNTING
• ReferencePostMounnginstruconsonpage5.
COLLAR BRACKET WITH ATP: BRACKET INSTALLATION
Step 1: Mark Bracket Hole Locaons
1. Markthecenterlineofeachpostwithapencil.
2. TakemeasurementsusedinFig.46and47tomarkbracket
holelocaonsontoposts.
Tip:
Remove all metal shavings from deck, post base cover,
post, and panel before bracket is screwed to post to
prevent rust stains.
Fig. 46
Bracket Hole Locaons: Collar Bracket With ATP
Pre-drill Dimensions: Pre-drillingwitha3/16”[5mm]drillbitisrequired
All panel sizes except 40” [1016mm] panel can use the ATP.
Only 32” [813mm] and 34” [864mm] panels are used with ATP’s in California.
*DimensionAposionsboomedgeofboomrail3-3/4”[95mm]abovedecksurface.
*DimensionAismeasuredfromtheboomsurfaceofpostbase.
34” [864mm] Panel
32” [813mm] Panel
3-3/16’”[81mm]
3-3/16’”[81mm]
A*
3-3/16’”[81mm]
30-3/4”[781mm]
28-3/4”[730mm]
B
34-3/4”[883mm]
2-3/16”[56mm]
2-3/16”[56mm]
C
2-3/16”[56mm]
2-7/16”[62mm]
2-7/16”[62mm]
D
2-7/16”[62mm]
2-9/16”[65mm]
2-9/16”[65mm]
E
2-9/16”[65mm]
38” [965mm] Panel