Installation Guide

Need help with installation? Call 1-844-4-pergola or fourseasonsbp.com/DIY
STEP 5: FIRST ROOF PANELS
Components Needed
12” wide twin vee panels
#10 x 3/8” sheet metal screw
Tools Recommended
FIRST: Begin this step on far LEFT side of
hanging channel when facing the structure.
Begin with “female” lock edge of panel flush
to hanging channel and front fascia. Top of
panel slides below ledge of hanging channel to
sit on groove for screw location.
SECOND: Insert and press first panel firmly
into foam rubber gasket within the hanging
channel interior. Secure first roof panel with
#10 x 3/8” sheet metal screw through pre-
punched hole into groove location. Move
square post connected fascia assembly “side
to side” so that first roof panel is square to
fascia board or wall.
THIRD: Each individual roof panel is 12” wide
and need to align with 12” marked on hanging
channel and front fascia in STEP #2.
Each panel is designed with unique side edge
as “male” and a “female” to interlock with
next roof panel.
NOTE: When attaching to wall (no access from top) attach screws from underside into
bottom flange of hanging channel (not into screw groove) using #10 x 3/8” sheet metal
screws.