Installation Guide

12
STEP 6: LAST ROOF PANELS
Components Needed
12” wide twin vee panels
#10 x 3/8” sheet metal screw
Tools Recommended
FIRST: Begin this step on far RIGHT side of
hanging channel when facing the structure
leaving large space from first roof panel. Last
roof panel needs “male” lock edge flush to
outside edge of hanging channel and front
fascia. Top of panel slide below top ledge of
hanging channel to sit on groove for screw
location.
SECOND: Insert and press last panel firmly
into foam rubber gasket within the hanging
channel interior.
Secure last roof panel with #10 x 3/8” sheet
metal screw through pre-punched hole into
groove location.
THIRD: Secure the last roof panel above the
square post side end with #10 x 3/8” sheet
metal screw in pre-punched hole attaching to
front fascia.
Move square post connected fascia assembly
“side to side” so that last roof panel is square
to fascia board or wall.
NOTE: When attaching to wall (no access from top) attach screws from underside into
bottom flange of hanging channel (not into screw groove) using #10 x 3/8” sheet metal
screws.