Installation Guide

Need help with installation? Call 1-844-4-pergola or fourseasonsbp.com/DIY
STEP 7: ALL ROOF PANELS
Components Needed
12” wide twin vee panels
#10 x 3/8” sheet metal screw
Caulk tube & gun
Tools Recommended
FIRST: YOU MUST ALWAYS ADJUST THE
INTERLOCKING JOINT BETWEEN THE TWO
PANELS TO ALIGN WITH THE 12” MARKS ON
THE HANGING CHANNEL AND THE FRONT
FASCIA.
SECOND: Remove the sheet metal screw
from the installed first roof panel from the
“male” side of panel at the front fascia.
Next to installed panel, lay the new roof panel
and slightly lift new roof panel to overlap
“female” lock on top of “male” lock. Apply
downward pressure for tight fit on entire
panel.
THIRD: Slide new roof panel back into
hanging channel and firmly into foam rubber
gasket. Caulk panel ends to foam rubber
gasket. Align new roof panel on 12” mark
before securing with #10 x 3/8” sheet metal
screw.
Repeat with remaining roof panels until last
roof panel which needs to be removed & re-
fastened.
NOTE: Each panel must align on 12” mark from step #2 before securing and
moving to next panel installation.