Need help with installation? Call 1-844-4-pergola or fourseasonsbp.com/DIY
STEP 9: ATTACH SIDE FASCIA
Components Needed
Side fascia
#10 x 3/8” sheet metal screw
Preformed flashing
Tools Recommended
FIRST: Place the top flange of the side fascia
over the top flange of the hanging channel at
the wall.
Place the top flange of the side fascia under
the top flange of the front fascia.
SECOND: Using adaptor and #10 x 3/8”
sheet metal screw, fasten the side fascia to
the hanging channel and front fascia. Also,
fasten at approx. 24” spacing to panel.
THIRD: Install preformed flashing into
grove on hanging rail. Position over
first and second panels. Bend tabs
down so they fit snug on surface of
roof panel. Screw flashing to peaks of
roof panels using #10 x 3/8” sheet
metal screws. Caulk the top of screw
heads.