Installation Guide

6
MATERIALS
Organize & check-in all materials received in your shipment within a safe distance
from work area before you begin the installation process.
Mark “Check-in” column in each row of component below and note “Step #”
associated each task during this assembly
Part Description
Dimensions
Step #
Check-in
COMPONENTS
Urathane caulking
tubes
2
PVC foam weather strip
12’x3/4”
2
Hanging channel - male
12’x3/4”
2
Hanging channel - female
12’x3/4”
2
Hanging rail
12’x6”x2”
2
Preformed flashing
25”
3
Front fascia
12’ ¾”
3
Fascia splice full strength
30”
3
Front fascia dam
foam
3
Front fascia drain
8”
3
Extruded Square Post
10’x3”x3”
4
Fluted Top Post Connector
3”
4
Fluted Bottom Post Brackets
3”
4
12” wide twin vee panel
7’x12
7
Side fascia panels
11
Fascia pan clips
12
Mag gutter panel
12’x3/4”
12
Pressbreak corner angle
6 ½”
12
HARDWARE
Bolt & Nut (set)
¼” x ¾”
multiple
Bolt & Nut (set)
3/8” x 3 ½”
multiple
Washer
¼” x ¾”
multiple
Nut
3/8”
multiple
SMS Screw
#10 x 3/8”
multiple
Lag Screw
#12 x 2 ½”
multiple
Tek Screw (self drilling)
#8 x 5/8”
multiple
Tek Screw (self drilling)
¼” x ¾”
multiple
Kwik Bolt
3/8” x 2 ¾”
multiple