Installation Guide

Need help with installation? Call 1-844-4-pergola or fourseasonsbp.com/DIY
STEP 3: HANGING CHANNEL
Components Needed
Hanging channel
Hanging rail
Front fascia
Foam rubber gasket
Tools Recommended
Determine and Measure center point for installation on desired structure wall
FIRST: Place hanging rail in desired position
on structure wall or roof fascia board and
mark first hole to be drilled in hanging rail
relative to rafters or wall studs. Place a mark
1” down from top hanging rail and drill ¼”
into each rafter or studs across length of
hanging rail.
SECOND: Slide hanging channel into bottom
of hanging rail then fasten hanging rail with
#12 x 2-1/2” screws to fascia board or wall
across entire rail. Place a bead of caulk across
entire span between rail/wall space.
THIRD: Insert foam rubber gasket into the
interior back wall of hanging channel.