Installation Guide

PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
STEP 5C: Setting First & Last Roof Panels (continued) Stand up the Edge
Beam and Post Assembly, tying Posts to the ladders or with help from a few
building buddies. Square up the left end of the Edge Beam with the left end of the
Hanging Rail on the house. Set the Posts in front of your post chaulkline.
LifeRoom Optima Installation Guide
STEP 5D: Setting First Roof & Last Panels Make sure the RIGHT end of the
3" Edge Beam (#F) is square with the RIGHT end of the Hanging Channel (#B) at
the house. Slide the first Roof Panel into the Hanging Channel tightly against the
Foam Weatherstripping
with the FEMALE lock of Roof Panel on the RIGHT, having
the RIGHT edge of Roof Panel FLUSH with the right end of the 3" Edge Beam.