Installation Guide

PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
LifeRoom Optima Installation Guide
STEP 5E: Setting the First & Last
Roof Panels (continued) The pre-
punched holes in the Roof Panel
should be lined-up with the screw
groove in the bottom leg of the
Hanging Channel. Use one #10x3/8"
SMS to fasten the first section of roof
panel to the Hanging Channel as
shown.
STEP 5F: Using a 4' level, plumb level the front side of the Post while the Post is
set in front of the chaulk line. Use a framing square against the roof panel inside
the hanging channel to make sure the right Female edge of roof panel is square
with the right end of the 3" Edge Beam. If not square, move the Edge Beam and
Posts to be square and lined-up properly. Then, fasten the first section of the Roof
Panel to the 3" Edge Beam using one #10x3/4 tek screw. DO NOT anchor the
Post bottom yet.
STEP 5G: Take the second Roof Panel to
the far left end of the Hanging Channel
and 3" Edge Beam. Line-up the left male
side of Roof Panel with the end of the 3"
Edge Beam. The pre-punched holes in the
Roof Panel should be lined up with the
screw groove in the bottom leg of the
HANGING CHANNEL. Use ONE
#10x3/8" SMS to fasten the last section of
roof panel to the Hanging Channel. Do not
anchor the Post bottom yet.