Installation Guide

PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
4/8/2022 22
PATIO COVER INSTRUCTION SHEETS
LifeRoom Optima Installation Guide
STEP 6F: Running the Roof
Panels & Pre-formed Flashing
(continued) Put a dab of
caulk sealant under the 1
st
notch
on the right side where it rests
on the Roof Panel. Fasten through
the Flashing into the Roof Panel
top using one #10 tek screw.
Then, put another dab of caulk
over the screw head.
STEP 6G: After you install 2 more
Roof Panels, having 3 roof panels
exposed, run the next Pre-formed
Flashing, repeating Steps 6 D&E.
NOTE: As you run the Roof
Panels, ensure the Roof Panel
seams are in line with the 12”
spacing marks from Step 1. Be
sure to caulk and fasten through
both pieces of Flashing where they
overlap, then fasten the Flashing
through every other notch. Run the
remaining Roof Panels and Pre-
formed Flashings. When you’re near
last Roof Panel, remove it so you
can run the last 2 Roof Panels.
Caulk around and on top of all the
screw heads.