Installation Guide

PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
LifeRoom Optima Installation Guide
STEP 7A: Anchoring the Posts Each
Post must be plumb level in both directions
(front and side). Make sure to keep the Critical
Post Spacing Measurements between the front
Posts at the top and bottom. Set the posts in
front of your post chaulkline, double-check with
the level and Critical Post Spacing
Measurements. Drill 3/8" holes with a masonry
bit (not included).
STEP 7B: Spin the nut down the Wedge Anchor
so the hammer will not hit it, and only hit the top
of the anchor shaft. Tap the Wedge Anchor into
the hole and tighten with a wrench.
STEP 7C: Repeat Steps 7 A&B for the remaining
posts. The Critical Post Spacing Measurements
are important for the future installation of the
LifeScreens.