Installation Guide

PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
LifeRoom Optima Installation Guide
STEP 10C: Corner Angles
(continued) Fasten each corner using
2 #10 x 3/4 teks each side.
STEP 11A: Installing Fascia Drains
Measure 6" from both ends of the Front
Fascia and mark with a pencil on the
bottom in the center. Use a 2" hole saw
to drill a hole through the bottom of
the Front Fascia.
STEP 11B: Run a small bead of caulk
around the flange of the Fascia Drain.
Center the Fascia Drain over the hole,
pressing it against the bottom of the
Front Fascia. Fasten using only 2
#10x3/4” tek screws upward into the
Front Fascia.
STEP 11C: Inside the Front Fascia,
caulk the 2 screws that fastened the
Fascia Drain.