Installation Guide

PATIO COVER INSTRUCTION SHEETS
support@FourSeasonsOLS.Com
4/8/2022 9
PATIO COVER INSTRUCTION SHEETS
LifeRoom Optima Installation Guide
STEP 2G: Edge Beam Preparation (continued): Rotate the beam one time.
Butt the measuring tape to the Top Post Bracket (#I) and measure to the left ___"
then move measuring tape to the other side of bracket and measure to the right ___.“
NOTE: refer to the front view LAYOUT SHEET for your size Patio Cover Critical
Post Spacing measurements, adding 3/16" to the post bracket spacing measurement
and location of the Top Post Bracket (#I).