Instruction Manual

BADMINTON/VOLLEYBALL
Franklin Sports Inc.
Stoughton, MA 02072
Made in China
For replacements parts call
1-781-341-5178 or 1-800-225-8649
OR visit www.franklinsports.com
Side view
#2
Side view
#1
= open hole
= closed hole
Non-Playing
Side
Playing
Side
ITEM # 50601
Ages 8+
ASSEMBLY INSTRUCTIONS:
Remove all contents from bag near the area where you will be playing. Set up will require two people.
A. Begin by assembling both poles (see illustration on back).
B. Person #1 -- Hold one of the poles upright; pole should be resting on pole base insert at a 90 degree
angle from the ground.
C. Person #2 -- Attach the plastic hook of the double guy rope to the top hole of the top pole. Holding
both ropes, walk away from the center of the pole, then walk one of the ropes 5ft (1.5m) to the left of dead
center, and the other rope 5ft (1.5m) to the right of dead center. Ground stakes should be put into the
ground at a 45-degree angle from the pole.
D. Attach the plastic hook of the guy rope to the hole in the middle pole and put the ground stake into the
ground so that the guy rope runs opposite the net and at a 45-degree angle from the pole. (The middle
guy rope stake should be 5ft (1.5m) from each topguy rope stake.)
E. Take the two black bungee plastic hooks and attach one to each set of double-holes on the top pole.
F. Hold the net so that the Franklin logo is on top.
G. Attach the opposite ends of the black-bungee plastic hooks to the net. The top one attaches to the
metal grommet on the top corner of the net, and the bottom hook attaches to the very bottom corner of the
net itself.
H. Take the white rope that runs out from the top of the net and run it through the indents at the very top
of the assembled pole. Then run that rope down the side of the pole and attach its plastic hook in the
same hole as the guy rope.
I. Adjust the guy rope tension clips to remove all slack from the ropes. Start with the top guy ropes first,
then do the middle guy rope, and finally the white net guy rope. (Do not over-tighten lines.)
J. Place black pole cap on top of assembled pole to hold rope in place.
K. While Person #1 remains holding the completely assembled pole, Person #2 can now go to the
opposite pole and attach the net to that side.
L. When Person #2 has the second pole upright and far enough away that the net is taut, Person #1 can
let go of the first pole and repeat steps C through J for the second pole.
M. When the second side is completely assembled, readjust all guy ropes as needed.
N. Net tension clips can be adjusted at this time, if necessary.
GAME RULES AND COURT LAYOUT
PARTS LIST:
(1) Pump & Needle(1) Volleyball
(2) Pole Sets (2) Middle Guy Ropes
(2) Top Guy Ropes
(1) Net
(4) Rackets
(2) Shuttlecocks
(4) Pole Hooks
(2) Ground Stabilizers(2) Pole Caps
(1) Carry Bag(2) Scoring Rings

Summary of content (2 pages)