Installation Guide

3
INSTALL THE ACCORDION PANELS
Page 7
A: Remove the air conditioner from the carton
and place on a at surface.
B: Remove top rail, insulation foam hardware
and weather stripping from the packaging’
material. DO NOT DISCARD WITH STYROFOAM
PACKAGING MATERIALS.
C: Align the holes on the top rail with those in
the tpo of the unit, as shown in Fig. B.
D: Secure the top rail to the unit with the 3/8”
screws provided, as shown in Fig. C. For safety
reasons, all four screws MUST be used.
Fig.1
Fig.2
Fig.3
Fig.C
Fig.B
PREPARE AIR CONDITIONER
2
NOTE: The design of the top rail and side panels
is oset slightly to provide the proper angle of
installation (5/16” pitch to the rear). This is
necessary for proper water drainage.
A: Grasp the solid end of one panel and pull the
inner accordion shade towards the open end.
See Fig. 1 for illustration.
B. Slide the free endsof the accordion panel directly
into the holding slot on the side of the air
conditioner cabinet as shown in Fig. 2. Slide
the panel down all the way and make sure it sits
securely inside the channel.
C. Slide the top and bottom ends of the frame into
the top and botom rails of the cabinet, as shown in
Fig. 3. The top of the frame slides into the top rail, and
the bottom of the frame slides into the channel under
the unit.
D. Repeat steps B and C to install the other side panel.
Top Rail
Bottom Rail
Top Rail
Bottom Rail
Top left
Top right
Installation
Instructions