Manual

920-087-04 (8-05)
AppendixA: ElectricalWiringfor265 VoltModels
NOTE: Itis recommended thatthe PXSB subbase assembly,the PXCJ conduit kit and the PXDS disconnect switch be installed on all
hardwired units. Ifinstalling aflush-floor mounted unit, make provisions for all the line voltage power leads and conduit to be removed
for ease of maintenance and service to the chassis.
Toinstall the line voltage powerleads and conduit to the chassis, follow the instructions below.
1. Remove the four control box retaining screws (A)and open
the control box.
2. Pull the chassispower leadwires (B) (locatedonthe bottom-
right side of the control box) through the plastic bushing so
they are located inside the control box.
3. Remove the plastic bushing.
4. Route the linevoltage power leads through the holewhere
the plastic bushingwas located, and secure itsconduit (use
a 1!2" straight conduit connector, with the Iocknut on the
inside of the control box.)
5. Make the appropriate electrical connections within the
control box, then secure the box on the chassis. Detailed
instructions are included with the installation instructions
for the conduit kit (PXCJ).
6. Route the line voltage power conduit from the control
box straight down the right front to the bottom side of the
chassis. Thiswill allow thefront cover to be installedwithout
interference with the electrical conduit.
Figure15
LineVoltageConnections
Screws
Fuse holder
Screws
Inside back of control
panel cover.
21