Users Manual Part 2

1. INSTALLATION
1-24
1.5 Power Supply Unit
This unit can be installed on a bulkhead, wall or on the floor.
1.5.1 Installation considerations
Keep in mind the following points when selecting a location.
Locate the processor unit away from heat sources because of heat that can build
up inside the cabinet.
Select a location where the vibration is minimal.
Locate the equipment away from places subject to water splash and rain.
Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
A magnetic compass will be affected if the processor unit is placed too close to the
magnetic compass. Observe the compass safe distances in the SAFETY IN-
STRUCTIONS to prevent interference to a magnetic compass.
Install the processor unit on the floor, or on a bulkhead with the following direction.
For bulkhead, the cable entry must face the deck.
Connect the ground wire (IV-8sq, local supply) between the earth terminal on the
chassis and the ship’s earth, using the supplied crimp-on-lug FV2-4 BLU.
: Cable entry
Installation
on a
bulkhead
Installation
on a floor
OK
OK