Users Manual Part 2
1. INSTALLATION
1-24
1.5 Power Supply Unit
This unit can be installed on a bulkhead, wall or on the floor.
1.5.1 Installation considerations
Keep in mind the following points when selecting a location.
• Locate the processor unit away from heat sources because of heat that can build
up inside the cabinet.
• Select a location where the vibration is minimal.
• Locate the equipment away from places subject to water splash and rain.
• Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
• A magnetic compass will be affected if the processor unit is placed too close to the
magnetic compass. Observe the compass safe distances in the SAFETY IN-
STRUCTIONS to prevent interference to a magnetic compass.
• Install the processor unit on the floor, or on a bulkhead with the following direction.
For bulkhead, the cable entry must face the deck.
• Connect the ground wire (IV-8sq, local supply) between the earth terminal on the
chassis and the ship’s earth, using the supplied crimp-on-lug FV2-4 BLU.
: Cable entry
Installation
on a
bulkhead
Installation
on a floor
OK
OK