Installation Instructions

Page 1 of 1
General Installation Notes
Any adhesives, sealants, fillers or paint used must be compatible with the material that is being installed (see manufacturer’s recommendations in the
Finishing and Adhesives section below). Always use corrosion-resistant mechanical nails or screws along with manufacturer’s recommended adhesive
product when installing all Fypon products. This combination provides a secure, long-lasting bond. Countersink all fasteners about
1
/
8
and fill with
product compatible filler. Exterior installations should be finished using a manufacturer’s recommended caulk to prevent water infiltration behind
siding, windows and doors. Some exterior installations, in particular new construction before siding is applied, may require a J-channel and/or
flashing to prevent water infiltration. Installers must determine which installation technique is best for the specific situation.
Finishing and Adhesives
Polyurethane (PUR) – Fypon polyurethane products are factory primed. Depending on product location, always use interior/exterior-grade, PUR
compatible adhesives, sealants, and fillers when installing Fypon products. Consult the manufacturer’s recommendations for your particular
climate and the substrate you are installing to.
Cellular PVC – Depending on product location, always use interior/exterior-grade, PVC compatible adhesives, sealants, and fillers when installing
Fypon products. Consult the manufacturer’s recommendations for your particular climate and the substrate you are installing to. If painting is
desired, a 100% acrylic latex paint with a Light Reflectance Value (LRV) of 55% or higher must be used. Applying paint with an LRV of 54% or
lower will void the warranty.
IMPORTANT:
Please read these installation guidelines thoroughly before beginning installation. Please note that these guidelines are provided only to assist with the installation of Fypon moulding
and millwork products. Modified procedures may be required in order to meet specific situations, unique applications and local building codes. The manufacturer does not, under any
circumstances, warrant the installation of its products. Be sure to wear appropriate protective clothing, gloves and safety glasses when working with any tools. Installer should check
for and relocate all electrical wiring within the proposed installation area, as needed (be sure to disconnect all electric power before working with any electrical wiring and follow all
applicable local electrical codes and safety procedures).
Fypon, Ltd. 1750 Indian Wood Circle Maumee, Ohio 43537 1.800.446.3040 www.fypon.com
Please note the product has come from the factory pre-primed. The product must have a finish coat applied either prior to or after installation.
Painting prior to installation will require patching of fastener holes and touch up of paint.
Materials needed:
Tape Measure
Framing Square
Hammer
Screwdriver
Miter Saw
Nail Countersink
Caulk Gun
1. Measure and Cut Pilaster to Fit
A) Dry fit the crosshead and pilasters to determine if a height adjustment is needed. If necessary, cut the pilaster from the bottom
2. Install Crosshead
A) Install the crosshead above the door, ensuring it is centered and level, using non-corrosive fasteners and polyurethane compatible
adhesive.
3. Install Keystone (If your kit came with a loose keystone, if not move to Step 4)
A) Attach the keystone to the center of the crosshead using non-corrosive fasteners and polyurethane compatible adhesive.
4. Pilasters
A) Install the pilasters using non-corrosive fasteners and polyurethane compatible adhesive.
5. Fill all fastener holes and paint with acrylic latex paint.
NOTE: The stone surround ships as three 96” long lineals and a keystone. The installer must cut to length along with mitering the corners to fit
around the door.
DOOR SURROUND KIT
INSTALLATION INSTRUCTIONS
Exterior Grade Caulk
Pencil
Safety Glasses
Polyurethane Compatible Adhesive
Polyurethane Compatible Filler
Sandpaper
Corrosion-Resistant Fasteners