User Manual

Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over a GE Oven and Warming
Drawer:
NOTE: Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the 75-pound product, plus additional oven
loads of up to 50 pounds or a total weight of 125
pounds.
REMOVE THE PACKAGING
Lift the oven out of the carton.
Remove all packing material and tape.
Open the door and remove parts box.
Locate parts package containing mounting
screws.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported by
2 x 4 or 1 x 2
Runners all
Four Sides
27”
23-1/2”
25-1/8”
17-1/2”
2” Min.
Per Oven
Requirement
45-1/4”
9-1/4”
2” Min.
7
PREPARE THE OPENING (CONT.)
Installation over a GE Oven:
* If you are replacing a GE electric double oven
with the combined installation of an Advantium
120 and a single oven, use the dimensions
shown. The middle rail separating the two
openings may need to be larger than the 2”
minimum shown.
27”
23-1/2”
25-1/8”
17-1/2”
2” Min.
45-1/4”
Min.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported by
2 x 4 or 1 x 2
Runners all
Four Sides
Per Oven
Requirement