Install Guide

Standard Installation Preparation
6
PREPARE THE OPENING (CONT.)
Installation over a GE Appliances/
Monogram Oven and Warming Drawer:
NOTE: Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location does not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.
PREPARE THE OPENING (CONT.)
Installation over a GE Applainces/
Monogram Oven:
* If you are replacing a GE Appliances/
Monogram electric double oven with the
combined installation of an Advantium/
Convection 120 and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2” minimum shown.
Construct
solid bottom -
Min. 3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
Per Oven
Requirement
45-1/4”
2” Min.
(3” Recommended)
Per Warming
Drawer
Requirement
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
45-1/4”
Min.
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
Per Oven
Requirement
IMPORTANT: Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.