Installation Instructions Advantium™ 120 Built-In SpeedCook Ovens SCB1000 SCB1001 ZSC1000 ZSC1001 For a Spanish version of this manual, visit our Website at ge.com. Para consultar una version en español de este manual de instrucciones, visite nuestro sitio de internet ge.com.
Safety Information BEFORE YOU BEGIN CAUTION: Read these instructions completely and carefully. For personal safety, remove house fuse or oven circuit breaker before beginning installation to avoid severe or fatal shock injury. • IMPORTANT – Save these instructions for local inspector’s use.
Design Information MODELS AVAILABLE Profile Models: Monogram Models: SCB1000 WW – White SCB1000 BB – Black SCB1000 CC – Bisque SCB1001 SS – Stainless Steel ZSC1000 BB – Black ZSC1001 SS – Stainless Steel PRODUCT DIMENSIONS AND CLEARANCES 22-9/16” 21-1/2” 29-3/4” With Optional Side Trim 26-3/4” 1-1/8” 18-5/8” 13” 1-1/16” 13/16” NOTE: Appearance may vary slightly by model.
Design Information ADVANCE PLANNING • These ovens may be installed directly into a 27" or 30" wide oven cabinet. • The oven must be installed at least 36-3/4" above the floor. • The front surface of the oven will be nearly flush with surrounding cabinetry doors. • Allow for clearance to adjacent corners, walls, drawers, etc. • This oven can be installed over any GE or GE Monogram single electric built-in oven or a warming drawer or both.
Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120 volt, 60 Hz, 15 amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. • Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating. • The power supply cord and plug should be brought to a separate 15 or 20 ampere branch circuit single grounded receptacle.
Installation Preparation PREPARE THE OPENING PREPARE THE OPENING The Advantium 120 can be installed in combination with other GE/Monogram appliances. Always follow each product’s Installation Instructions to complete the installation. Installation over a GE/Monogram Warming Drawer: 27” or 30” 23-1/2” Single Advantium 120 Installation: Order a 27" or 30" wide single oven cabinet or cut the opening in a wall to the dimensions shown.
Installation Preparation PREPARE THE OPENING PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven: 27” or 30” 23-1/2” 25-1/8” 17-1/2” (CONT.) Installation over a GE/Monogram Oven and Warming Drawer: Construct Solid Bottom Min. 3/8” Plywood Supported by 2 x 4 or 1 x 2 Runners all Four Sides 27” or 30” Construct Solid Bottom Min. 3/8” Plywood Supported by 2 x 4 or 1 x 2 Runners all Four Sides 23-1/2” 25-1/8” 2” Min. 2” Min.
Installation STEP 1 SLIDE THE OVEN INTO THE CUTOUT STEP 2 INSTALL BOTTOM TRIM • Align bottom trim tabs to slots in the bottom of the oven. CAUTION: Two people are required to lift the oven into the opening. Grasp the bottom at the front and rear. DO NOT USE THE HANDLE TO LIFT THE OVEN. DAMAGE WILL OCCUR! MISE EN GARDE : Deux personnes sont nécessaires pour soulever le four et l’insérer dans l’ouverture. Saisissez-le par le dessous, à l’avant et à l’arrière.
Installation STEP 3 INSTALL SIDE TRIM STEP 4 INSTALL MOUNTING SCREWS FOR 30" CABINET INSTALLATION ONLY. SKIP THIS STEP IF YOU HAVE 27" WIDE CABINETRY. • Drill pilot holes through the side flanges, 2 on each side. • Drive the color matched screws into the side flange (and side trim, if applied). • Open the oven door. • Hang the side trim pieces on the tabs behind the oven flange.The screw holes in the side trim should align with the holes in the oven flange.
Notes 10
Notes 11
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Pub. No. 49-40459-1 07-05 JR P/No.