Installation Guide

Installation (continued)
S
P
1
3
2
Q
Operate the lift rod (S) up and down to verify that
the stopper (P) opens and closes correctly.
8
Checking the operation of the pop up
7
Adjusting the lift rod strap
Push down the ball rod (Q) so that the drain is at “open position”.
Rotate the connector on the strip to the proper height to connect to the ball rod when it is at “open position”.
HOMEDEPOT.COM/GLACIERBAY
Please contact 1-855-HD-GLACIER for
further assistance.
7