User Manual

12221906B
Diagram 5.4
UNION
NUT
GAS FIRE
FEED PIPE
Diagram 5.5
9480
SECURING
SCREWS (2)
9497
FIRE
ISOLATING
VALVE
BOILER USER
CONTROL
LOUVRE
ASSEMBLY
5 Installation
FLOOR
PROTECTION
PLATE
5.2 Gas Supply Connection
Connect and tighten the union nut at the fire front isolatingvalve,
see diagram 5.4.
Refit floor protection plate if removed.
Turn gas On at the fire isolating valve by removing the cap and
turning restrictor screw anti-clockwise..
Pressure check the installation pipework for gas soundness. In
the United Kingdom check in accordance with the current
edition of BS6891. In the Republic of Ireland check in accordance
with the rules in force.
5.3 Boiler User Control
Remove the two securing screws from the boiler user control.
Place the boiler user control in position from the inside to the
aperture on the bottom of the R/H louvre of the fire chassis,
making sure that it is the correct way up, see diagram 5.5.
Secure from the outside to the louvre with the screws, from
fittings pack, see diagram 5.5.
5.4 Fit the Coal and Glass Panel Assembly
Place the coal bed in position. Make sure that the coal rests on
the ledges at the sides of the firebox and that its back face is
touching the horizontal rib at the back of the firebox, see
diagram 8 Instructions for Use.
Replace the glass panel assembly and secure to the firebox by
turning the two screws 1/4 turn clockwise.
Diagram 5.3
DOG POINT SCREWS
9474
DOG POINT
SCREW (2)
TOP FIXING
BOTTOM FIXING
LOUVRE
ASSEMBLY